Article 7-8-10 — Floodplain Management and Flood Damage Prevention
General provisions.
Definitions.
"Accessory structure or facility" means a structure which is on the same parcel of property as the principal structure and the use of which is incidental to the use of the primary structure.
"Addition" means any walled and roofed expansion to the perimeter or height of a building.
"Adjacent" means those areas located within the defined horizontal distance from the future-conditions floodplain boundary that are at or lower in elevation than either three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher, unless the area is hydraulically independent (meaning absolutely no connection to the flooding source such as through pipes, sewer laterals, down drains, foundation drains, ground seepage, overland flow, gated or valved pipes, excavated and backfilled trenches, etc. with no fill or other manmade barriers creating the separation).
"Appeal" means a request for a review by the public works director's or designee's interpretation of any provision of this article.
"Area of future-conditions flood hazard" means the land area that would be inundated by the one-percent-annual-chance flood based on future-conditions hydrology (100-year future-conditions flood).
"Area of shallow flooding" means a designated AO or AH Zone on a community's flood insurance rate map (FIRM) with a one percent or greater chance of flooding to an average depth of one to three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow.
"Area of special flood hazard" is the land in the floodplain subject to a one percent or greater chance of flooding in any given year. This includes all floodplain and flood prone areas at or below the base flood elevation (including A, A1-30, A-99, AE, AO, AH, and AR on a community's flood insurance rate map (FIRM).
"Base flood" means the flood having a one percent chance of being equaled or exceeded in any given year, also known as the "100-year flood".
"Base flood elevation" means the highest water surface elevation anticipated at any given location during the base flood.
"Basement" means any area of a building having its floor sub-grade below ground level on all sides.
"Building" has the same meaning as "structure".
"Development" means any man-made change to improved or unimproved real estate including but not limited to buildings or other structures, mining, dredging, filling, clearing, grubbing, grading, paving, any other installation of impervious cover, excavation or drilling operations or storage of equipment or materials.
"Elevated building" means a non-basement building which has its lowest elevated floor raised above the ground level by foundation walls, shear walls, posts, piers, pilings, or columns.
"Existing construction" means any structure for which the "start of construction" commenced before January 11, 1978.
"Existing manufactured home park or subdivision" means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, construction of streets, and final site grading or the pouring of concrete pads) is completed before January 11, 1978.
"Expansion to an existing manufactured home park or subdivision" means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed, (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) was completed before January 11, 1978.
"FEMA" means the Federal Emergency Management Agency.
"Flood" or "flooding" means a general and temporary condition of partial or complete inundation of normally dry land areas from:
"Flood insurance rate map" or "FIRM" means an official map of a community, issued by the Federal Emergency Management Agency, delineating the areas of special flood hazard and/or risk premium zones applicable to the community.
"Flood insurance study" or "FIS" means the official report by FEMA providing an evaluation and determination of flood hazards and corresponding flood profiles and water surface elevations of the base flood.
"Floodplain" or "flood-prone area" means any land area susceptible to flooding.
"Floodproofing" means any combination of structural and non-structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents.
"Floodway" or "regulatory floodway" means the channel of a stream, river, or other watercourse and the adjacent areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height.
"Functionally dependent use" means a use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, but does not include long-term storage or related manufacturing facilities.
"Future-conditions flood" means the flood having a one percent chance of being equaled or exceeded in any given year based on future-conditions hydrology. Also known as the 100-year future-conditions flood.
"Future-conditions flood elevation" means the highest water surface elevation anticipated at any given location during the future-conditions flood.
"Future-conditions floodplain" means any land area susceptible to flooding by the future-conditions flood.
"Future-conditions hydrology" means the flood discharges associated with projected land-use conditions based on a community's zoning map, comprehensive land-use plans, and/or watershed study projections, and without consideration of projected future construction of flood detention structures or projected future hydraulic modifications within a stream or other waterway, such as bridge and culvert construction, fill, and excavation.
"Highest adjacent grade" means the highest natural elevation of the ground surface, prior to construction next to the proposed walls of a structure.
"Lowest floor" means the lowest floor of the lowest enclosed area, including basement. An unfinished or flood-resistant enclosure, usable solely for parking of vehicles, building access, or storage, in an area other than a basement area, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other provisions of this article.
"Manufactured home" means a building, transportable in one or more sections, which is built on a permanent chassis and is designed to be used with or without a permanent foundation when connected to the required utilities. The term includes any structure commonly referred to as a "mobile home" regardless of the date of manufacture. The term also includes parked trailers, travel trailers and similar transportable structures placed on a site for 180 consecutive days or longer and intended to be improved property. The term does not include a "recreational vehicle".
"Mean sea level" means the datum to which base flood elevations shown on a community's flood insurance rate map (FIRM) are referenced. For purposes of this article the term is synonymous with National Geodetic Vertical Datum (NGVD) of 1929 or the North American Vertical Datum (NAVD) of 1988.
"New construction" means any structure (see definition) for which the "start of construction" commenced on or after January 11, 1978, and includes any subsequent improvements to the structure.
"New manufactured home park or subdivision" means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after January 11, 1978.
"Owner" means the legal or beneficial owner of a site, including but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site.
"Permit" means the permit issued by the public works department to the applicant which is required for undertaking any land development activity.
"Repetitive loss" means flood-related damage sustained by a structure on two separate occasions during a ten-year period for which the cost of repairs at the time of each such flood event, on the average, equals or exceeds 25 percent of the market value of the structure before the damage occurred.
"Site" means the parcel of land being developed, or the portion thereof on which the land development project is located.
"Start of construction" includes substantial improvement, and means the date the permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition placement, or other improvement was within 180 days of the permit date. The actual start means either the first placement of permanent construction of the structure on a site, such as the pouring of slabs or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation, and includes the placement of a manufactured home on a foundation. Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings such as garages or sheds not occupied as dwelling units or part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building.
"Structure" means a walled and roofed building (including a gas or liquid storage tank) that is principally above ground, or a manufactured home.
"Subdivision" means the division of a tract or parcel of land resulting in one or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway.
"Substantial damage" means damage of any origin sustained by a structure whereby the cost of restoring the structure to its before-damaged condition would equal or exceed 50 percent of the market value of the structure before the damage occurred. This term also includes "repetitive loss".
"Substantial improvement" means any reconstruction, rehabilitation, addition, or other improvement to a structure, taking place during a ten-year period, in which the cumulative cost equals or exceeds 50 percent of the market value of the structure prior to the improvement. The market value of the building means (1) the appraised value of the structure prior to the start of the initial repair or improvement, or (2) in the case of damage, the value of the structure prior to the damage occurring. This term includes structures which have incurred "substantial damage", regardless of the actual repair work performed. The term does not, however, include those improvements of a structure required to comply with existing state or local health, sanitary, or safety code specifications which are the minimum necessary to assure safe living condi-tions, which have been identified by the chief building official. The term does also not include any alteration of a historic structure, provided that the alteration will not preclude the structure's continued designation as a historic structure.
"Substantially improved existing manufactured home park or subdivision" means the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds 50 percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced.
"Variance" means a grant of relief from the requirements of this article.
"Violation" means the failure of a structure or other development to be fully compliant with the requirements of this article. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in this article is presumed to be in violation until such time as that documentation is provided. (Ord. No. 8052, 10/10/2018, § 1)
Permit procedures and requirements.
Unless specifically excluded by this article, any landowner or developer desiring a permit for a land development activity shall submit to the public works director or designee a permit application on a form provided by him for that purpose. No land development permit will be approved for any land development activities that do not meet the requirements, restrictions and criteria of this article.
No permit will be approved for any development activities that do not meet the requirements, restrictions and criteria of this article.
The approved floodplain management/flood damage prevention plan shall contain certification by the applicant that all development activities will be done according to the plan or previously approved revisions. Any and all development permits and/or use and occupancy certificates or permits may be revoked at any time if the construction and development activities are not in strict accordance with approved plans.
Any work undertaken prior to approval of these certifications shall be at the permit holder's risk. The public works director or designee shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further work being allowed to proceed. Failure to submit certification or failure to make the corrections required hereby shall be cause to issue a stop-work order for the project.
Standards for development.
The property owner's failure to maintain facilities will be considered a violation of this article. (Ord. No. 8052, 10/10/2018, § 1)
Provisions for flood damage reduction.
have been met;
Substantial improvement of principal residential structures shall not be allowed within the limits of the futureconditions floodplain unless all requirements of Subsections 7-8-
If all of the requirements of Subsec-tions 7-8-10-040 C., D. and E. have been met, all substantial improve-ments shall have the lowest floor, including basement, elevated no lower than three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to equalize the hydrostatic flood forces on exterior walls and to facilitate the unimpeded movements of flood waters shall be provided in accordance with standards of Subsection 7-8-10-050 A.5.a.
Substantial improvements of principal non-residential structures shall not be allowed within the limits of the futureconditions floodplain unless all requirements of Subsec-tions 7-8-10-040 C., D. and E. have been met. If all of the requirements of Subsections 7-8-10-040 C., D. and
Substantial improvement hat has met all of the requirements of Subsections 7-8-10-040 C., D. and
If data are not available from any of these sources, the following provisions shall apply:
Variance procedures.
The following variance and appeals procedures shall apply to an applicant who has been denied a permit for a development activity, or to an owner or developer who has not applied for a permit because it is clear that the proposed development activity would be inconsistent with the provisions of this article.
Violations, enforcement and penalties.
Any action or inaction which violates the provisions of this article or the requirements of an approved stormwater management plan or permit, may be subject to the enforcement actions outlined in this article. Any such action or inaction which is continuous with respect to time is deemed to be a public nuisance and may be abated by injunctive or other equitable relief. The imposition of any of the penalties described below shall not prevent such equitable relief.
Each act of violation and each day upon which any violation shall occur shall constitute a separate offense.
CONTROL*