LandCode
Sugar HillBuffer, Landscape and Tree Ordinance

Article 3 — Buffer Regulations

current as of 2014-12-30verified current · checked 2026-08-24Officialofficial source3 sections · full chapter
§ 3.1

APPLICABILITY.

3.1.1 Buffers shall be required between dissimilar districts or

uses in accordance with the provisions of the Zoning Ordinance or as a condition of zoning, special use or variance approval.

§ 3.2

STANDARDS FOR PERMANENT BUFFERS

3.2.1 Width of Buffers

Buffers shall meet the minimum width requirements contained in the Zoning Ordinance, except as authorized to be reduced by the applicable buffer reduction process, as follows:

a.As specified in the "Minimum Buffer Strip Requirement Table"; or
b.As specified in a residential zoning district for a permitted non-residential use (e.g. a church, temple, synagogue, etc.); or
c.As required by a condition of zoning, special use, or variance approval.
3.2.2 Screening Requirements
a.Buffers shall be natural, undisturbed, and free of
Table or figure — shown as printedverify at source
encroachments           except      as   authorized      by   a    condition     of

zoning,     special            use  or   variance          approval,        or   as

authorized      herein,            and   shall     contain         the  existing

tree   cover    and      vegetation      as      well  as     any  supplemental

plantings       or  replantings          as   may  be    required.
b.Buffers shall be of such nature and density so as to
Table or figure — shown as printedverify at source
screen      activities,             structures         and      uses    on      the

property       from     view     from    the     normal    level   of   a   first

story   window          on  an      abutting     lot     and     shall  further

provide     a   year-round          effective      visual     screen.

City of Sugar Hill 3.1

3.2.2 (Cont.)
c.Buffers required along side property lines shall extend to a street right-of-way line unless otherwise required by the Director in order to observe the sight distance requirements contained in the Development Regulations, or as authorized by a condition of zoning, special use, or variance approval.
d.In situations where the required buffer width is
Table or figure — shown as printedverify at source
partially         or     completely       contained         within    an     existing

easement       (e.g.          power      or    natural        gas     transmission,

etc.),    the        screening         requirements           of   this   Ordinance

shall     be   met      outside      of   the    easement      area.
3.2.3 Supplemental Plantings
a.Buffers in which vegetation is non-existent or is inadequate to meet the screening requirements of this Ordinance shall be planted with supplemental plantings so as to provide a year-round effective visual screen.
b.Supplemental plantings and replantings shall consist of evergreen trees, shrubs, or combination thereof, native or adaptable to the region. All trees planted shall be a minimum of 6 feet in height at time of planting and shall be a species which will achieve a height of at least 20 feet at maturity. All shrubs planted shall be a large growing species, shall be a minimum of 3 feet in height at time of planting and shall be a species which will achieve a height of at least 10 feet at maturity.
c.All supplemental plantings shall be installed to allow for proper plant growth and maintenance.
3.2.4 Non-Vegetative Screening
a.Non-vegetative materials utilized to satisfy the
Table or figure — shown as printedverify at source
screening      requirements              of   this      Ordinance,     in    addition

to   the  use        of  existing        vegetation         and/or    supplemental

plantings,           may      consist        of    walls,         fences,      earthen

berms     or   any      combination          thereof.
b.If walls or fences are to be utilized, their placement and installation shall be such so as to City of Sugar Hill 3.2 cause minimal disturbance of existing vegetation and located so as to provide an effective visual screen.
3.2.5 Disturbance or Encroachments
Table or figure — shown as printedverify at source
a.     Ditches,          swales,     stormwater        conveyance           facilities,

       stormwater         detention       ponds,    sanitary        sewer   conveyance

       facilities,        similar         facilities,          and     any  associated

       easements,         shall      not   encroach      into       a   buffer     except

       that       necessary        access      and  utility         crossings      (e.g.

       stormwater         or   sanitary    sewer    pipes)         may   encroach    into

       the   buffer       as   near  to    perpendicular          as   practical.

b.     Supplemental           plantings    or   replantings            of   vegetation,

       or    authorized        non-vegetative       screening           devices    shall

       be    authorized         to      encroach    into       a    buffer      provided

       there         is   minimal        disturbance       of       any     significant

existing vegetation.

c.Land disturbance is authorized in areas of a buffer
Table or figure — shown as printedverify at source
that       are    devoid     of    significant      vegetation           provided

that   the        final     grade   and      replantings         of  vegetation

meet   the        screening   requirements          contained        herein.
d.Dying, diseased or dead vegetation may be removed
Table or figure — shown as printedverify at source
from       a  buffer     provided        minimal    disturbance             occurs.

Vegetation         thus       removed        shall      be     replaced     where

necessary          to       meet    the      screening              requirements

contained herein.

3.2.6 Protection During Land Disturbing Activities
a.During authorized land disturbing activities, buffers shall be clearly demarcated and protected prior to commencement of, and during, construction.
b.The method of demarcation and protection utilized shall be in accordance with Best Management Practices(BMP) or as required by the Department.
§ 3.3

STANDARDS FOR CONSTRUCTION BUFFERS.

3.3.1 Where Required

Construction buffers shall be required where specifically provided in the Zoning Ordinance between single family residential subdivisions, or as a condition of zoning, special use or variance approval.

City of Sugar Hill 3.3

3.3.2 Time Constraints

Construction buffers shall only be in effect during the construction period of a project and shall terminate upon project completion. In the case of a residential subdivision, a construction buffer shall terminate upon each individual lot with the issuance of a Certificate of Occupancy for the principal dwelling.

3.3.3 Disturbance or Encroachments
a.Construction buffers shall be natural, undisturbed
Table or figure — shown as printedverify at source
and   free     of   encroachments            except       as  authorized          by  a

condition          of    zoning,         special          use         or     variance

approval,      or   as   authorized          herein.
b.The encroachment of ditches, swales, stormwater
Table or figure — shown as printedverify at source
conveyance         facilities,           stormwater           detention      ponds,

sediment           basins,            sanitary            sewer           conveyance

facilities,        similar            facilities,        and     any      associated

easements, into a construction buffer shall not be

Table or figure — shown as printedverify at source
authorized       except        that     necessary         access      and    utility

crossings      (e.g.     stormwater          or    sanitary        sewer     pipes),

and   natural      bottom         detention      ponds        (sediment      basins

must  be    located      outside         of  the     construction            buffer)

and their appurtenant structures which require no grading and removal of trees, may encroach upon the construction buffer.

c.If the construction buffer on a residential lot is
Table or figure — shown as printedverify at source
devoid     of  existing           trees     and  vegetation,          and    a    tree

survey     is    submitted         to   document        this     situation      prior

to    conducting        land       disturbing        activities           (including

clearing)        on      the       lot,      then       the      Department       may

authorize      the     encroachment          of  a   building         or   structure

into the construction buffer for a distance not to exceed 10 feet.

3.3.4 Protection During Land Disturbing Activities
a.During authorized land disturbing activities, construction buffers shall be clearly demarcated and protected prior to commencement of, and during, construction.

City of Sugar Hill 3.4

Table or figure — shown as printedverify at source
b.     The   method   of  demarcation     and   protection  utilized

       shall  be  in  accordance    with  Best  Management  Practices

       (BMP)  or  as  required  by  the   Department.

City of Sugar Hill 3.5 ARTICLE 4 LANDSCAPE REGULATIONS