Title 3 — Development and Permitting, Chapter 400 — Soil Erosion, Sedimentation, and Pollution Control
Title and Purpose
The real potential exists for excessive quantities of soil to erode from areas that are undergoing land disturbance.
The resulting sediment could clog storm sewers and road ditches, add mud to streams and silt lakes, rivers, and reservoirs. Excessive sediment limits the use of water for most beneficial purposes. Sediment choked streams are unsightly and their reduced channel capacity can result in flooding and associated damages, including the threat to the public health and safety. Therefore, it is the purpose of this chapter is to effectively contain soil erosion and sedimentation on the parcels where land is being disturbed by requiring provisions for water disposal and the protection of soil surfaces prior to, during, and after the land disturbance in order to promote the safety, public health, convenience, and general welfare of the citizens of Gwinnett County.
Exemptions
This Chapter shall apply to any land-disturbing activity undertaken by any person on any land except for the following:
1968.
maintenance work, fences, and other related activities which result in minor soil erosion.
and is not a part of a larger common plan of development or sale with a planned disturbance of equal to or greater than one acre and not otherwise exempted under this paragraph; provided, however, that construction of any such residence shall conform to the minimum requirements set forth in Sections 400-30.1, 400-30.2, and 400-30.3 of this UDO, O.C.G.A. § 12-7-6, and this paragraph. For single-family residence construction covered by the provisions of this paragraph, there shall be a buffer zone between the residence and any state waters classified as trout streams pursuant to O.C.G.A. § 12-5-20 et seq. In any such buffer zone, no land disturbing activity shall be constructed between the residence and the point where vegetation has been wrested by normal stream flow or wave action from the banks of the trout waters. For primary trout waters, the buffer zone shall be at least 50 horizontal feet, and no variance to a smaller buffer shall be granted. For secondary trout waters, the buffer zone shall be at least 50 horizontal feet, but the Director of the Environmental Protection Division may grant variances to no less than 25 feet. Regardless of whether a trout stream is primary or secondary, for first order trout waters, which are streams into which no other streams flow except for springs, the buffer shall be at least 25 horizontal feet, and no variance to a smaller buffer shall be granted. The general provision and minimum requirements of 400-30.1 and the minimum requirements of Sections 400-30.2 and 400-30.3 of this UDO, O.C.G.A. § 12-7-6(b) and the buffer zones provided by this section shall be enforced by the Department.
crops; feeding, breeding, or managing livestock or poultry; producing or storing feed for use in the production of livestock, including, but not limited to, cattle, calves, swine, hogs, goats, sheep, and rabbits, or for use in the production of poultry, including, but not limited to, chickens, hens, ratites, and turkeys; producing plants, trees, fowl, or animals; or the production of aquacultural, horticultural, dairy, livestock, poultry, eggs, and apiarian products.
exempt forestry practices cause or result in land-disturbing or other activities otherwise prohibited in a buffer, as established in Subsections 400-30.3.O. and 400-30.3.P of this UDO, no other land disturbing activities, except for normal forest management practices, shall be allowed on the entire property upon which the forestry practices were conducted for a period of three years after completion of such forestry practices.
Conservation Service of the United States Department of Agriculture. This excludes those land-disturbing activities undertaken by a person who has requested technical advice only rather than active participation from the Natural Resources Conservation Service;
exemption shall not apply to any of the following activities:
both, by the Georgia Department of Transportation, the Georgia Highway Authority, the State Road and Tollway Authority, or the Gwinnett County Department of Transportation; provided, however, that construction or maintenance projects of the Georgia Department of Transportation or the State Road and Tollway Authority which disturb one or more contiguous acres of land shall be subject to the provisions of O.C.G.A. § 12-7-7.1; except where the Georgia Department of Transportation, the Georgia Highway Authority, or the State Road and Tollway Authority is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case a copy of a notice of intent under the state general permit shall be submitted to the local issuing authority, the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders;
electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power; except where an electric membership corporation or municipal electrical system or any public utility under the regulatory jurisdiction of the Public Service Commission, any utility under the regulatory jurisdiction of the Federal Energy Regulatory Commission, any cable television system as defined in O.C.G.A. § 36-18-1, or any agency or instrumentality of the United States engaged in the generation, transmission, or distribution of power is a secondary permittee for a project located within a larger common plan of development or sale under the state general permit, in which case the local issuing authority shall enforce compliance with the minimum requirements set forth in O.C.G.A. § 12-7-6 as if a permit had been issued, and violations shall be subject to the same penalties as violations by permit holders; and,
Requirements for Erosion and Sedimentation Control Using Best
Management Practices.
Excessive soil erosion and resulting sedimentation can take place during land disturbing activities. Therefore, plans for those land-disturbing activities that are not exempted by this Chapter shall contain provisions for the application of soil erosion, sedimentation and pollution control measures and practices. These provisions shall be incorporated into the Erosion, Sedimentation, and Pollution Control Plans. Soil erosion, sedimentation and pollution control measures and practices shall conform to the requirements of Sections 400-30.2 and 400-30.3. The application of measures and practices shall apply to all features of the site, including street and utility installations, drainage facilities and other temporary and permanent improvements.
Measures shall be installed and continually maintained to prevent or control erosion, sedimentation and pollution during all stages of any land-disturbing activity in accordance with the requirements of this UDO and the NPDES general permit.
The rules and regulations, ordinances or resolutions adopted pursuant to O.C.G.A. § 12-7-1 et seq. for the purpose of governing land-disturbing activities shall require, as a minimum, protections at least as stringent as the state general permit; and Best Management Practices, including sound conservation and engineering practices to prevent and minimize erosion and resultant sedimentation which are consistent with, and no less stringent than the state general permit, and those practices contained in the Manual for Erosion and Sediment Control in Georgia published by the Georgia Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity was permitted, shall be observed by all land disturbers and plan preparers, as well as the following:
The disturbed area shall be stabilized with permanent vegetation if land-disturbing activity ceases for more than 30 calendar days.
The Director of the Environmental Protection Division may grant a variance from such buffer to allow land-disturbing activity, provided that adequate erosion control measures are incorporated in the project plans and specifications and are implemented. The following requirements shall apply to any such buffer:
Proof or Presumption of Violation by Injury
The fact that land-disturbing activity for which a land disturbance permit has been issued results in injury to the property of another shall neither constitute proof of, nor create a presumption of, a violation of the standards provided for in this UDO or the terms of a land disturbance permit.
Permit Application and Plan Requirements
The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of Gwinnett County that affect the tract to be disturbed and the area surrounding it. They shall review the UDO and any other ordinances, regulations, or permits that regulate the development of land within the unincorporated areas of Gwinnett County. However, the operator is the only party who may obtain a land disturbance permit.
except that any and all fees due from an entity that is required to give notice pursuant to O.C.G.A. § 12-7-17(9) and (10) shall be submitted in full to the Georgia Environmental Protection Division regardless of the existence of a Local Issuing Authority in the jurisdiction. The local issuing authority with plan review authority shall approve or disapprove a revised plan within 35 days of receipt.
Inspections
disturbance permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures and practices required in the plan are effective in controlling erosion and sedimentation.
Also regulated by Gwinnett County are primary, secondary, and tertiary permittees as such terms are defined in the state general permit. Primary permittees shall be responsible for installation and maintenance of best management practices where the primary permittee is conducting land-disturbing activities. Secondary permittees shall be responsible for installation and maintenance of best management practices where the secondary permittee is conducting land-disturbing activities. Tertiary permittees shall be responsible for installation and maintenance where the tertiary permittee is conducting land-disturbing activities.
to carry out the duties as prescribed in this ordinance, and for this purpose to enter at reasonable times upon any property, public or private, for the purpose of investigation and inspecting the sites of land-disturbing activities.
Department who requests entry for the purpose of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties.
Violations, Enforcement, and Penalties
Any action or inaction that violates the provisions of this Chapter 400 shall be subject to the enforcement actions and penalties identified in Chapter 120 of this UDO.
Education and Certification Required
inspection or any land-disturbing activity shall meet the education and training certification requirements, dependent on their level of involvement with the process, as developed by the Georgia Soil and Water Conservation Commission in consultation with the Environmental Protection Division of the Department of Natural Resources and the stakeholder advisory board created pursuant to O.C.G.A. § 12-7-20.
primary, secondary, or tertiary permittee, as defined in the state general permit, shall have as a minimum one person who is in responsible charge of erosion and sedimentation control activities on behalf of said entity or person and meets the applicable education or training certification requirements developed by the Georgia Soil and Water Conservation Commission present on site whenever land-disturbing activities are conducted on that site. A project site shall herein be defined as any land disturbance site or multiple sites within a larger common plan of development or sale permitted by an owner or operator for compliance with the state general permit.
certified personnel on site may contract with certified persons to meet the requirements of this ordinance.
met the certification requirements of O.C.G.A. § 12-7-19(b)(1), then any person or entity involved in land-disturbing activity at that site and operating in a subcontractor capacity for such permittee shall meet those educational requirements specified in O.C.G.A. § 12-7-19(b)(4) and shall not be required to meet any educational requirements that exceed those specified in said paragraph.