Title 3 — Development and Permitting, Chapter 800 — Stormwater Management
Stormwater Management General
hydrology of the site. The goal is to reduce the amount of stormwater runoff and pollutants that are released, provide for natural on-site control and treatment of runoff, and optimize the location of stormwater management facilities. These goals are met through runoff reduction or water quality, channel protection, overbank flood protection and extreme flood protection.
to the maximum extent practicable. Runoff reduction practices are stormwater best management practices, BMP's, used to disconnect impervious and disturbed pervious surfaces from the stormwater drainage system to reduce the post-construction stormwater runoff rates, volumes, and pollutant loads. Runoff Reduction shall be used where practical, prior to using water quality standards. If the Runoff Reduction requirements cannot be met in whole or part, then the water quality standards shall be used to treat the remainder.
storms that occur in an average year and reduce the average annual post-development total suspended solids loadings by 80% to meet the water quality requirement. The water quality requirement can be waived if the entire 100% of runoff reduction is provided. Water quality and runoff reduction can also be provided in conjunction to meet the water quality requirements outlined in the Gwinnett County Stormwater Management Manual.
urban development is the primary cause of stream bank erosion and the widening and downcutting of stream channels. In order to reduce the effects of urban development within the stream channels, channel protection must be provided. Stream channel protection shall be provided using the following three approaches:
combined with those of all bypass areas in the same basin, produce peak flow rates and flow velocities at the site's boundary line no greater than those which occurred at the same location for pre-developed conditions. A downstream analysis may warrant a development to over-detain to protect downstream properties or may even warrant reduction/elimination of detention due to the timing of peak discharges within the watershed as outlined in Sections 800-50.2 and 800-50.3.
diminish rapidly as the distance downstream from the point of discharge increases, and the smaller the facility's contribution is, as a percentage of the total runoff contributing to downstream flow, the shorter the distance downstream that the benefits are realized. Because of these limitations, on-site stormwater treatment is effective at controlling flooding only when flow from the facility is a significant percentage of the total flow at the point of interest, and only if the point of interest is immediately downstream. The concepts of immediately downstream and significant percentage of total flow are inseparable. The portion of a receiving watercourse (one which receives and conveys runoff from a site) which lies downstream from the site to the point where the area of the site is 10 percent of the total drainage area, shall generally be considered to constitute that portion of the watercourse which is immediately downstream.
frequency storm events to meet the requirements of overbank flood protection. The 100-year event shall be provided when failure to do so would result in flooding of other habitable dwellings, property damage, or public access and/or utility interruption (extreme flood protection).
BMP's outlined in the Gwinnett County Stormwater Management Manual. A temperature increase greater than 2°F is not allowed within a trout stream.
Stormwater Management Documentation
project site using Best Management Practices (BMP's) and diligent engineering. The report must follow the guidelines set forth in the Gwinnett County Stormwater Management Manual and is required for all developments. The report shall be certified by a qualified registered professional registered in the State of Georgia.
entering and exiting the site for both pre-and post-developed conditions. Analysis of the off-site properties shall anticipate future development in addition to addressing existing conditions.
following meanings. The analysis of downstream conditions in the report shall address each and every point or area along the project site's boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage way "immediately" downstream from the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is 10 percent of the total basin area. The analysis shall be in accordance with the Gwinnett County Stormwater Management Manual.
Stormwater Management Report, and in determining whether stormwater treatment is required for any portion of any site:
drawing of the facility was over 18 months prior to the new development's submittal, the authorized registered professional shall provide one of the following:
Management Manual and the Gwinnett County Storm Sewer Pipe Standards.
currently registered in the State of Georgia. A certified record drawing of the facility shall be prepared based upon this survey. The authorized registered professional shall certify that the facility functions hydraulically as designed.
Documentation demonstrating the required testing outlined in the Gwinnett County Stormwater Management Manual for the proposed stormwater BMP shall also be provided. The record drawing shall be submitted to the Department at least one week prior to the issuance of a Certificate of Occupancy or Final Plat approval (as appropriate for the project). Record drawings of off-site facilities shall be recorded at least one week prior to the recording of the Final Plat.
permits have been acquired for the site prior to approval of the stormwater management report.
Stormwater Runoff Quality/Reduction
any combination of the two. The applicant shall provide runoff reduction in accordance with the requirements of the Gwinnett County Stormwater Management Manual. To the extent Runoff Reduction has been determined to be infeasible for all or a portion of the site using the Planning and Development Practicability Policy, then water quality shall apply for the remaining runoff from a 1.2-inch rainfall event. The design professional shall schedule a meeting with Planning and Development when requesting removal or reduction of the runoff reduction requirement.
criteria, shall provide water quality treatment or runoff reduction as outlined in the Gwinnett County Stormwater Management Manual.
Stormwater Management Report shall be the same for water quality facilities as for stormwater management facilities in Section 800-20.7.
Stream Channel Protection
each individual discharge location for the 1-yr storm event.
channel protection volume by a proportional amount.
wetlands, lakes, estuaries, or tidal waters where the reduction in the smaller flows will not have a negative impact on the stream banks or channel integrity.
Stormwater Peak Flow Design Criteria
runoff is expected to result from the development of a property, that project shall be provided with stormwater management facilities that provide storage (i.e., detention, extended detention, or retention) as discussed in the Gwinnett County Stormwater Management Manual. The meaning of "adverse impact" shall apply when pre-development flows did not cause difficulties and post-development flows do. Difficulties shall include, but not be limited to, situations where 25-year velocities exceed the non-erosive velocity of the stream, habitable structures are shown to be subject to increased depth of flooding for any frequency up to and including the regulatory flood, and stormwater facilities that cannot carry the design storm in accordance with these regulations.
authorized registered professional certifies and provides certified documentation supporting the conclusion to the Director that at least one of the following is true and correct as applicable.
extreme flood protection may not be necessary because of anticipated compliance with Section 800-50.2, rigid compliance with all of the following criteria is mandatory:
be certified by the qualified registered professional. The design shall be in accordance with the Gwinnett County Stormwater Management Manual and the Gwinnett County Storm Sewer Pipe Standards.
of the two shall control the peak flow rates associated with storms having 2-year, 5-year, 10-year, and 25-year return frequencies so that flows from the developed site do not exceed those associated with pre-development conditions at the project boundary nor increase the peak flows downstream from the project to the point in the drainage basin where the project area is 10 percent of the total basin. Where adverse impacts, as defined in Section 800-50.1, occur during the 100-year storm, the 100-year storm shall also be regulated.
Stormwater Management Manual.
be consistent with those shown in the Gwinnett County Stormwater Management Manual.
both for pre- and post-developed conditions. Likewise, adequate support must be provided for all composite runoff coefficients or curve numbers used.
Stormwater Management Facility Location and Easement Criteria
total area of the approved stormwater BMPs outlined in the Gwinnett County Stormwater Management Manual.
The stormwater BMPs outlined in the Gwinnett County Stormwater Management Manual are intended to be used in a series or as a standalone, where applicable, to meet the requirements outlined within the Gwinnett County Stormwater Management Manual and Chapter 800 of the UDO. If multiple BMPs are used to meet the stormwater requirements, then all BMP's will be marked a stormwater management facility.
amount of flow generated on the project that bypasses the facility.
voluntary) buffer, landscape strip, or tree protection area, except that natural bottom stormwater management ponds and its appurtenant structures, which require no grading and removal of trees, may encroach into a required construction buffer.
encroach upon utility easements or rights-of-way, upon receipt by the Department of written permission from both the property and utility owners.
within an open space area as specified in Section 800-60.6 above, then a mandatory property owners' association shall be established for the ownership and maintenance of all stormwater BMP's within a residential subdivision.
All stormwater BMP's which are placed on an individual private parcel, or which crosses multiple private lots must be located within a private drainage easement, which will include access to the right-of-way, to be maintained by the HOA. If the project is provided with an off-site stormwater treatment facility, a mandatory property owners' association shall be established for its maintenance. The association bylaws shall be recorded concurrently with the recording of a Final Subdivision Plat.
on a separate lot. The property owners served by a stormwater management facility that provides runoff reduction, water quality, channel protection, overbank flood protection, extreme flood protection or any combination for more than one property owner or is located off-site shall enter into a maintenance agreement acceptable to the County for the facility's maintenance. However, if desired by the developer, the facility may be located on a separate lot if it is owned and maintained by a mandatory property owners' association.
with the UDO section 1000-10.3B shall be required to provide access to all linear stormwater BMPs from a public street. The private drainage easements are to be shown on the subdivision's recorded plat and clearly labeled as a private drainage easement to be maintained by the HOA.
minimum, meet the requirements outlined in the Gwinnett County Stormwater Management Manual.
Management Manual.
conveyance of flows of water in excess of those for which the stormwater treatment facility was designed. In many instances, this function can be provided through installation of an emergency spillway. Emergency spillways are usually excavated open channels, either vegetated or paved with reinforced concrete.
approved by the Department and shall be in place and inspected prior to the initiation of other improvements. If the stormwater management is planned to be handled by a lake a stormwater BMP which shall provide runoff reduction, or any other stormwater management system as determined by Planning and Development, a temporary stormwater management facility shall be provided and shall remain in place until such time as the stormwater management facility has become effective in providing stormwater management. The construction shall be in accordance with the Gwinnett County Stormwater Management Manual.
areas for the site shall be recorded in an easement acceptable to the County. These areas shall be left in a natural, undisturbed condition except for walking trails.
Certificate of Occupancy for a non-subdivision project, the developer, shall meet the surety requirements of Chapter 900 and provide acceptable surety such as a bond or letter of credit, as determined by Planning & Development, providing for the stormwater management facility(ies) for a period of not less than 18 months. At the end of 18 months, the County may require the surety to be renewed due to anticipated improvements caused by such concerns as future construction activity within the project limits in the drainage basin. The surety for a facility shall be renewed until:
shall conform to the Gwinnett County Stormwater Management Manual and the Gwinnett County Storm Sewer Pipe Standards. In the case of rooftop stormwater treatment, permissible structural loads and weatherproofing shall be governed by the Georgia State Building Code as may be amended by the County.
Dams
Dams proposed to be 25-feet or more in height and proposed to have a maximum storage volume of 100 acre-feet or more and are determined to be a Category I dam as defined by the Georgia Safe Dams Program shall be subject to the requirements of the Georgia Safe Dams Act, the Rules for Dam Safety adopted by the Georgia Department of Natural Resources and the USDA Soil Conservations Service's Technical Release No. 60 "Earth Dam and Reservoirs". The developed shall obtain necessary approvals and permits from the Environmental Protection Division of the Georgia Department of Natural Resources for the project and the dam prior to securing a Development Permit from the Department.
Dams proposed to be nine feet or more in height, but less than 25 feet in height, in combination with an impounding capacity proposed to be 20 acre-feet or more at maximum water storage elevation, but less than 100 acre-feet, or dams determined Category II dams by the Georgia Safe Dams Program shall be subject to the following:
Prior to recording of a Final Plat or issuance of a Certificate of Occupancy, as appropriate, an as-built certification from a professional engineer shall be submitted to the Department. The certification shall state that the dam is constructed in accordance with the provisions of these regulations as well as the authorized construction plans. If the project is for the development of a subdivision, the developer shall also establish a legal entity, acceptable to Gwinnett County, such as a mandatory Property Owners Association, at time of recording of the Final Plat, responsible for the maintenance of the dam and its impoundment.
Existing dams that are located on a project site and will remain after construction is complete, shall comply with the provisions of this Chapter and all referenced chapters and sections as if they were new dams.
When an existing Category II dam may be reclassified to a Category I dam because of a proposed development downstream of the dam, the following shall be provided by the developer for review by the Georgia Safe Dams Program. The following information shall be provided:
Stormwater Management Practices for Redevelopment Projects
Gwinnett County Stormwater Management Manual. For redevelopment, the pre-developed conditions may take into account the existing conditions unless the existing development causes a negative impact on downstream property. The standards within this section apply to all redevelopment sites that meet the criteria in section 800-30.2.
site using Best Management Practices and diligent engineering. The report must follow the guidelines set forth in the Gwinnett County Stormwater Management Manual and is required for all redevelopment projects. A qualified registered professional in the State of Georgia shall certify the analysis. The analysis shall be in accordance with the criteria specified in Section 800-20.
accordance with the criteria specified in the Gwinnett County Stormwater Management Manual under the following conditions:
accordance with the criteria specified in the Gwinnett County Stormwater Management Manual under the following conditions:
maintenance agreement and must meet one of the following criteria:
Exemptions
Stormwater Management Manual to determine stormwater management requirements for each project.