Title 3 — Development and Permitting, Chapter 350 — Development Design Standards
Incorporation of Standard Drawings
The Department shall maintain on file for consultation and distribution a set of Standard Drawings, which may be updated administratively from time to time, illustrating details of construction and design of streets, stormwater management facilities, site improvements and other elements related to the development of land in accordance with this UDO and under the jurisdiction of the Department.
The Standard Drawings shall illustrate minimum acceptable standards for land development activities authorized under this UDO but shall not supersede more restrictive prudent design requirements or good engineering practices as applied to specific situations on a case-by-case basis.
Drawings shall be treated as though a part of this UDO for application to the minimum standards for design and construction of improvements required herein and subject to the modification and waiver provisions of this UDO.
Incorporation of the Gwinnett Countywide Trail Master Plan
Trails Master Plan.
regulations for application to the minimum standards for design, construction of improvements, and/or dedication of easements required herein and subject to the modification and waiver provisions of Section 340-40.
recommendations within the Master Plan shall prevail.
Design of Lots
Building setback lines shall conform to the minimum setback requirements of Title 2 of this UDO except where a greater distance is required by the Gwinnett County Construction Code.
Exceptions to Design of Lots
The creation of an unbuildable lot in a proposed subdivision for the exclusive purpose of subdivision identification signage or subdivision entrance landscape features is authorized only under the following circumstances (modification applications from the circumstances of this exception shall not be accepted):
The creation of an unbuildable lot for the exclusive purpose of providing and maintaining a stormwater management or utility facility is authorized, provided that such a lot meets all applicable requirements set forth in this UDO and under the jurisdiction of the Department.
The creation of an unbuildable lot for the exclusive purpose of providing and maintaining open space or conservation space for the enjoyment of the community is authorized.
Access and Right-of-Way
Vehicular access easements may be provided from a public street indirectly via easement subject to the following:
Right-of-Way for all public streets, existing and proposed, shall be dedicated in accordance with the street classifications as shown on the officially adopted Gwinnett County Long Range Road Classification Map or as required by Director or Designee of Gwinnett DOT.
easement and/or construction of greenway trails shall be provided in accordance with the prioritized greenway network map of the most currently approved Gwinnett Countywide Trails Master Plan, as follows:
Design of Blocks
The lengths, widths, and shapes of blocks shall be determined with regard to:
In blocks over 500 feet long, an alley, sidewalks, pedestrian way, or pedestrian access easement, shall be provided through the block to other streets within the development.
Residential Amenities, Open Space
Open space provided in projects located in the Big Haynes Creek Watershed Protection Area shall meet the following requirements:
Buffers, floodplains, and wetlands may be used as open space.