Title 3 — Development Regulations, Chapter 500 — Traffic Analysis.
Traffic Impact Analysis
A Traffic Impact Analysis shall be prepared for all developments where required in Section 280-20.03.B.14 or may be required for any development which generates less than 1,000 daily trips, and in the opinion of the Paulding County Department of Transportation Director, the development adversely impacts an existing roadway capacity problem and/or safety deficiency.
The report shall be prepared and sealed by a Professional Engineer licensed to practice in Georgia and trained and experienced in the application of traffic engineering.
A vicinity map showing the location of the proposed development in relation to the transportation system of the area.
A complete description of the proposed development, including:
A brief description of the current (and proposed, if applicable) land uses adjacent to the site.
A description of the study area for the Traffic Impact Analysis as defined by:
Title 3: Chapter 500
Traffic Memo
A Traffic Memo shall be prepared for all developments where required in Section 280-20.03.B.14 or may be required for any development which generates less than 50 peak hour trips, and in the opinion of the Paulding County Department of Transportation Director, the development adversely impacts an existing roadway capacity problem and/or safety deficiency.
The report shall be prepared and sealed by a Professional Engineer licensed to practice in Georgia and trained and experienced in the application of traffic engineering.
A summary describing the existing conditions shall cover the following:
utilizing counts less than 2 years old, 48 hours and bi-directional Georgia Department of Transportation (GDOT) coverage counts can be utilized if the count station is within ⅓ of a mile of the development. Paulding County yearly counts should be used if available over GDOT’s Count Station when closer than ⅓ of a mile from the proposed site.
A brief description of the current (and proposed, if applicable) land uses adjacent to the site.
A complete description of the proposed development, including:
Complete trip generation estimates for all phases and land uses of the proposed development should be calculated with the following requirements:
Sight distance shall meet minimum requirements per AASHTO. Include a sight distance profile.
A high-resolution site plan showing all connectivity, inter-parcel access and circulation.
Description and analysis of mitigation measures necessary to bring the identified intersections and locations into compliance with the applicable standards. Include analysis showing that these measures will bring these locations into compliance and include signal, turn lane, or other warrant analyses as appropriate.
Queueing Analysis
A Queueing Analysis showing 95th percentile and average queues, should be submitted for all developments where there is potential to generate significant traffic volumes, congestion delays, and could impact operations of the existing street roadway network.
practice in Georgia and trained and experienced in the application of traffic engineering.
A summary describing the existing conditions shall cover the following:
utilizing counts less than two years old, 48 hours and bi-directional Georgia Department of Transportation (GDOT) coverage counts can be utilized if the count station is within ⅓ of a mile of the development.
A brief description of the current (and proposed, if applicable) land uses adjacent to the site.
A complete description of the proposed development, including:
Utilization of a similar facility to collect queueing data is recommended. The existing site should have characteristics similar to the proposed project and the observed dates and time periods should be notated within the study.
Developments shall be designed to ensure the queue length is sufficient to handle expected queueing on-site without stacking onto the adjacent street network or impacting traffic flow on adjacent roadways.