§ 14-3.1

Purpose and Intent.

These districts are specifically established to provide for the mining, extraction, crushing, and quarrying, as appropriate, of sand, rock, precious metals, and other minerals or elements removed from the earth. Mining districts allow a range of other heavy industrial uses that may be accessory to mining operations or economically linked to such uses. However, uses permitted in industrial districts should be sited in industrial districts, not the MINE district unless such uses involve extraction of materials.

These districts may be suitable adjacent to agricultural zoning districts. Extensive building and operation setbacks and generous buffers are required to ensure that mining districts do not pose physical hazards or nuisances (e.g., dust, noise, vibration, etc.) to neighboring dwellings, schools, parks, places of worship, hospitals, commercial buildings, and public buildings and roads.

§ 14-3.2

Permitted and Conditional Uses.

As provided in Table 14.1; and subject to the following provisions which apply to all uses in this district:

(A)A conditional use is required for any establishment conducting around the clock business hours.

Certain specific uses are regulated by Chapter 16.

§ 14-3.3

Performance Standards.

As provided in Table 14.2.

§ 14-3.4

Site Development Regulations.

As provided in Article IV of this chapter.

§ 14-3.5

Application Requirements.

Any application for rezoning to the MINE district must be accompanied by the following:

(A)A detailed site plan as required by the director. At a minimum, the site plan shall indicate the following:

proposed location of phased mining operations; proposed locations or disposition of topsoil, overburden, and by-products, on- or off-site.

(B)A letter of intent describing the date proposed for the commencement of operations and their expected durations, including proposed hours and days of operation. Operations shall not be permitted on Sundays and holidays, nor will they be permitted within the hours of 7:00 p.m. and 7:00 a.m. on any day. Said letter shall also describe the nature of mining operations, method(s) of extraction, and equipment and materials (e.g., explosives) to be used. The letter of intent and any actions stipulated to or reasonably implied from the language of the letter of intent shall become conditions of development approval, if the rezoning application is approved.
(C)Written evidence by a geologist or other competent professional qualified to make such a judgment that the site to be rezoned MINE contains a mineral resource area or other valuable surface or subsurface substances that can be economically mined.
(D)An impact statement prepared by a qualified professional that addresses the impact of the proposed mining operation on abutting and nearby buildings, uses, and properties. The impact statement shall address those external effects determined by the director to be likely to exist if said use is established, including but not limited to as appropriate, electromagnetic interference, noise, vibration, fumes, odors, dust and air particulates, illumination, truck traffic, and water table protection. The impact statement shall recommend specific measures to mitigate such impacts and provisions for monitoring and enforcing mitigation measures, and, if approved, the recommendations of the impact statement shall be considered conditions of approval unless otherwise specified by action of the Forsyth County Board of Commissioners. At the option of the Board of Commissioners and at the applicant's expense, an independent impact statement may be secured prior to its taking action on a rezoning request for MINE district to review the impact statement submitted by the applicant or to otherwise address probable adverse impacts of the proposed development; provided that an application process for rezoning to MINE shall be extended no more than sixty-two (62) days beyond normal processing times for the purposes of securing an independent impact statement.
(E)An operations plan and all documents submitted or prepared for submission to the Georgia Department of Natural Resources for the purpose of obtaining a State Mining Permit. It shall be the responsibility of the applicant to update all information during the State application process and to inform the director of the final disposition of the State permit process. Operations plans, if approved, shall be considered conditions of development approval, unless otherwise specified by the director.
(F)A reclamation plan which shall include a description of how the excavated land will be restored, statement of intended future use of the land, and phasing and timing estimates of reclamation and rehabilitation activities. Reclamation plans, if approved, shall be considered conditions of development approval, unless otherwise specified by the Director. The Board of Commissioners of Forsyth County may require an applicant to post a bond calculated on a specific amount per acre for the purpose of insuring proper reclamation of the land.
TABLE 14.1
UsesIndustrial and Mining Zoning Districts
Restricted Industrial District (M1)Heavy Industrial District (M2)Mining Operations District (MINE)
Commercial recreational facilities, outdoorCCC
Commercial sales of the product(s) permitted to be manufactured, assembled, or processed, unenclosed or enclosed, not to exceed twenty (20) percent of the lot areaPPP
Commercial sales of the product(s) permitted to be extracted, unenclosed, exceeding twenty (20) percent of the lot area but not exceeding fifty (50) percent of the lot areaXCP
Communication towers and communication antennasCCC
Contractor’s establishmentsPPP
Convenience stores, with or without fuel dispensing unitsCCX
Cosmetics and toiletries manufacturersPPX
Data CentersCCC
Drive-throughs, excluding car washesXXX
Dry cleaning plantsPPX
Dwellings, single-family detachedXXX
Dwelling for caretaker or night watchmanPPP
Electronics assembly and manufacturing of communications equipmentPPX
Escort ServicesC (Note 1)C (Note 1)X
Explosives storageCPP
Exterminating and pest control businessesPPX
Extraction industries – extraction and removal of sand, gravel, top soil, clay, dirt, precious metals, gems, and mineralsXXP
Feed, grain, and fertilizer manufacturersXCX
Fuel oil distributorsPPX
Fuel stationCCX
Fiberglass insulation manufacturersXCX
Food processing plants, including fish and poultry facilitiesCCX
Restricted Industrial District (M1)Heavy Industrial District (M2)Mining Operations District (MINE)
Hazardous waste receiving, handling, and disposal facilitiesXXX
Heliports and HelipadsCCC
Ice manufacturingPPX
Incinerators, including medical wastesXCX
Instrument assembly and manufacturingPPX
Junkyards, wrecked motor vehicle compounds, and wrecker servicesCCC
Kennels, Animal Hospitals, Veterinary ClinicsCXX
LandfillsXCC
Linoleum manufacturersXCX
Lumber yards, planing and sawmillsPPP
Machine shopsPPX
Manufacturing, processing, recycling, and assembling within buildings, not otherwise specifiedPCC
Manufacturing, processing, recycling, and assembling of chemicals, floor coverings, glass, and rubber, unless more specifically listed in this tableXCX
Metal products manufacturingPPX
Micro-breweryCCX
Micro-distilleryCCX
Miscellaneous service establishmentsPCX
Offices and showrooms, as a principal use or as accessory uses to one or more permitted principal usesPPP
Office Commercial Multiple Story (OCMS) Zoning District uses and performance standardsC (Note 3)XX
Open air businesses, subject to limitations for open storage yards as provided in this tablePPP
Open storage yards, not exceeding 20% of the total lotCCC
Open storage yards, more than 20% but not exceeding 80% of the total lotCCC
Optical goods manufacturersPPX
Petroleum bulk storage sitesXPC
Pharmaceuticals and medical supplies manufacturersPPX
Place of worship 10,000 square feet or less in aggregate size (Note 7)P (Note 2)XX
Restricted Industrial District (M1)Heavy Industrial District (M2)Mining Operations District (MINE)
Place of worship more than 10,000 square feet in aggregate size (Note 7)P (Note 2)XX
Pool HallCXX
Printing, blueprinting, publishing, and book binding facilitiesPPX
Public and semi-public usesPPP
Pulp millsXCX
Recycling and recovery facilitiesCCX
Research laboratories, and ancillary manufacturingCCC
Restaurants, not including drive- throughsPPX
Retail Trade EstablishmentsXXX
SalonPXX
Salvage yardsCPX
Schools, private, parochial, vocational—Technical and business 10,000 square feet or less in aggregate sizeP (Note 2)XX
Schools, private, parochial, vocational—Technical and business more than 10,000 square feet in aggregate sizeP (Note 2)XX
Shooting range, indoorC (Note 4)C (Note 4)X
Shooting range, outdoorC (Note 4)C (Note 4)C (Note 4)
Short-term RentalXXX
Sign fabrication and painting shopsPPX
Solid waste transfer stationsCCC
Solvent metal cleaningXCX
Stock yards and slaughterhousesXCX
Storage, self-service, climate controlledCCX
Storage, self-service, courtyardCCX
Storage, self-service, mini-warehouseCCX
Temporary structures and usesCCC
Textile manufacturing and processingPPX
TheatersCXX
Tire retreading and recapping facilitiesCPX
Transportation, communication, and utility facilities, except truck terminalsCCC
Restricted Industrial District (M1)Heavy Industrial District (M2)Mining Operations District (MINE)
Truck terminalsCCC
Uses not specified in this table(Note 5)(Note 5)(Note 5)
Vehicle rental establishmentXXX
Vehicle sales dealershipC (Note 6)XX
Volatile organic liquid handling and storageXCX
Warehouses and storage buildingsPPP
Wholesale trade establishmentsPPX
WineriesCPX
Wood products manufacturingPPX

Notes

TABLE 14.2
TABLE 14.2
PERFORMANCE STANDARDS FOR INDUSTRIAL AND MINING OPERATIONS
Performance StandardIndustrial and Mining Zoning Districts
Restricted Industrial District (M1)Heavy Industrial District (M2)Mining Operations District (MINE)
Minimum lot area for zoning to the district1 acre (Note 1)1 acre50 acres where blasting or crushing operations are involved; 5 acres without blasting or crushing operations
Maximum building coverage (% of lot)55 percent55 percent55 percent
Minimum landscaped open space (percentage of total lot area)20 percent15 percent10 percent
Minimum width of landscape strip paralleling right-of-way (Note 2)25 feet25 feet50 feet
Minimum front setback from lot lines abutting right-of-way (Note 2 and 4)50 feet50 feet50 feet
Minimum buffer along lot line abutting a commercial or office district, except the OR district20 feet25 feet30 feet
Minimum setback along lot line abutting a commercial or office district, except the OR district (Note 4)30 feet35 feet40 feet
Minimum buffer along lot line abutting a residential, OR, A1 or AG-Res district (Note 3)40 feet75 feet100 feet
Minimum setback along lot line abutting a residential, OR, A1 or AG-Res district (Note 3 & 4)50 feet90 feet125 feet
Minimum side setback (Note 4)15 feet15 feet15 feet
Minimum rear setback (Note 4)25 feet25 feet25 feet
Minimum rear setback abutting an alley designed for industrial usesNoneNoneNone
Electromagnetic interferenceThere shall be no electromagnetic interference that adversely affects the operation of any equipment other than that belonging to the creator of such interference, or that does not conform to the regulations of the Federal Communications Commission.

Character Areas South Big Haw Creek & Chestatee Sawnee McFarland GA 400 Creek Daves Creek Lanier Vickery Creek Campground North GA 400 / Jot Em Etowah Mountain Down Maximum McFarland McFarland/ Shiloh Road Regional Node South GA 400 South GA 400/ Highway 141 Regional Node Big Creek Peachtree Parkway Community Node Haw Creek & Daves Creek Haw Creek Community Node Lanier Lake Lanier/ Mary Alice Park Community Node Vickery Creek Castleberry/ Bethelview Community Node Campground Highway 20 Neighborhood Node Highway 20 Community Node North GA 400 Hammond's Crossing Regional Node Chestatee/Jot Em Down Chestatee Neighborhood Node Etowah Matt and Silver City Neighborhood Nodes Sawnee Mountain Coal Mountain Community Node height Office Uses: Office 80’ Uses Non- Non- Non-(Note and Residential Residential Residential 50’ 6) 50’ Mixed 40’ 50’ 40’ Uses and 40’ 60’ 40’ Uses and 30’ 40’ 50’ 50’ Uses and 30’ 40’ 30’ 40’ 30’ 40’

Mixed Use: Mixed Use: Mixed Use: Mixed Use:

Use: 60’ 50’ 60’ 80’

70’ (Note (Note 5) (Note 5) (Note 5) (Note 5)

5)

Notes

Reading grid · rebuilt for display · verify at source (p. 191)