Gainesville › Unified Land Development Code
Article 11 — Subdivisions and Land Development, Chapter 11-10 — UTILITIES
§ 11-10-1
Sanitary Sewerage
(a)Connection required. Except as otherwise required in this section, each subdivider and land developer shall be required to pay for the installation of a sanitary sewerage collection system connected to the city's system serving his subdivision or land development. The layout and specifications of the system shall be in accordance with city specifications, as approved by the Director of Water Resources, and shall be installed by a contractor approved by the city.
(b)Connection to decentralized wastewater system. Where connection to the sanitary sewerage system is not feasible in the view of the Director of Water Resources, the lot shall contain adequate area for the installation and safe operation of the decentralized wastewater system, as approved by the Hall County Environmental Health Department.
§ 11-10-2
Water Service
(a)Connection required. Each subdivision or development shall connect to the city's water system and shall provide service to each lot or the development as a whole, as appropriate, at the expense of the subdivider or land developer.
(b)Specifications. The layout and specifications of the system shall be in accordance with city specifications, as approved by the Director of Water Resources, and shall be installed by a contractor approved by the city.
(c)Fire hydrants. Fire hydrants shall be installed in subdivisions and developments and shall meet the requirements of the fire department.