Article 11 — Subdivisions and Land Development, Chapter 11-11 — STORMWATER MANAGEMENT
Purposes.
Objectives
This chapter seeks to meet its purposes through the following objectives:
Definitions
engineering, architecture, landscape architecture, forestry, geology, or land surveying, or a person that is a Certified Professional in Erosion and Sediment Control (CPESC) with a current certification by EnviroCert, Inc. Design Professional shall practice in a manner that complies with applicable Georgia law governing professional licensure.
Technical Handbook, and its Appendices.
Land disturbing activity does not include agricultural operations as described in O.C.G.A. § 12-7-17(5) or forestry land management practices as described in O.C.G.A.
§ 12-7-17(6) within areas zoned for such activities.
Other terms used but not defined in this chapter shall be interpreted based on how such terms are defined and used in the GSMM and the city’s MS4 permit.
Stormwater Management Report Required
Applicability
The provisions of this chapter apply to any new development or redevelopment site that meets one or more of the following criteria as determined appropriate by the Director of Water Resources:
or (b) above.
Exemptions
The following activities are exempt from the requirements this chapter:
For this exemption to apply, any infeasibility report that is compliant with the city’s linear feasibility program shall first be submitted to the administrator and shall contain adequate documentation to support the evaluation for the applicable portion(s) and any resulting infeasibility determination, if any, by the administrator.
Variances
The Director of Water Resources may grant a variance from the requirements of this chapter if the proposed development activity will not:
Adoption and Implementation of the GSMM: Conflicts and
Inconsistencies
Designation of Administrator
The Director of the Department of Water Resources may from time to time appoint a designee to administer and implement this chapter.
Stormwater Management Standards
Subject to the applicability criteria in Section 11-11-5, exemptions in Section 11-11-6, and variances in Section 11-11-7, the following stormwater management standards apply. Additional details for each standard can be found in the GSMM:
Water Quality.
Pre-Submittal Meeting, Stormwater Concept Plan, and
Stormwater Management Plan Requirements
Application Procedures
Land development applications are handled as part of the process to obtain the land disturbance permit. Before any person begins development on a site, the owner of the site shall first obtain approval in accordance with the following procedure:
The stormwater management plan included in such applications becomes the approved stormwater management plan.
Compliance with the Approved Stormwater Management
Plan
Use of Stormwater Quality Site Development Review Tool
Required
Inspections to Ensure Plan Compliance During Construction
Periodic inspections of the stormwater management system during construction shall be conducted by the staff of the Department of Water Resources or conducted and certified by a professional engineer who has been approved by the Department of Water Resources.
Inspections shall use the approved stormwater management plan and the construction sequencing plan for establishing compliance. All inspections shall be documented with written reports that contain the following information:
Final Inspection; As-Built Drawings; Delivery of Inspection
Section 11-11-16. Final Inspection; As-Built Drawings; Delivery of Inspection and Maintenance Agreement
Violations and Enforcement
Any violation of the approved stormwater management plan during construction, failure to submit as-built drawings, failure to submit a final BMP landscaping plan, or failure of the final inspection shall constitute and be addressed as violations of, or failures to comply with, the underlying land disturbance permit or the underlying building permit. To address a violation of this chapter, the Department of Water Resources shall have all the powers and remedies that are available to it for other violations of building and land disturbance permits, including without limitation the right to issue notices and orders to ensure compliance, stop work orders, and penalties as set forth in the applicable ordinances for such permits.
Maintenance by Private Parties
On all commercial sites and on residential property where stormwater management facilities exist, the maintenance is the responsibility of the owner or operator of the property. It shall be the responsibility of the owner or operator to repair deficiencies in a timely manner.
Maintenance by Property or Homeowners Associations
When a subdivision or industrial/commercial park has a legally created property or homeowners association, the association will be responsible for maintenance of all drainage easements and all stormwater facilities within the entire development. The association may be required to apply larvicides, stock mosquito fish or take other measures, as required by the Department of Water Resources, to protect the health, safety and welfare of the public. The association shall be formed prior to final plat approval.
Maintenance by Owner of Stormwater Management
Systems Predating Current GSMM For any stormwater management systems approved and built based on requirements predating the current GSMM and that are not otherwise subject to an inspection and maintenance agreement, such stormwater management systems shall be maintained by the owner so that the stormwater management systems perform as they were originally designed.
Inspection and Maintenance Agreements
Right of Entry for Maintenance Inspections
Owner’s Failure to Maintain the Stormwater Management
System The terms of the inspection and maintenance agreement shall provide for what constitutes a failure to maintain a stormwater management system and the enforcement options available to the Department of Water Resources. If a site was developed before the requirement to have an inspection and maintenance agreement, or an inspection and maintenance agreement was for any reason not entered into, recorded, or has otherwise been invalidated or deemed insufficient, then:
Reference to Unified Stormwater Sizing Criteria
The GSMM has developed a set of unified stormwater sizing criteria that serves as the basis of designing stormwater facilities in the city. These criteria provide an integrated approach for meeting the stormwater runoff quality and quantity management requirements for those applicable developments identified in this section.
The purpose of the unified stormwater sizing criteria is to design a stormwater management system to:
Stormwater Design Sizing Criteria
Stormwater management typically relies on a system of natural and constructed facilities (practices) for the storage, treatment, and conveyance of runoff. This section provides an overview of the design criteria required for stormwater detention and conveyance facilities in the city.
| Sizing Criteria | Description | |
|---|---|---|
| Treatment, WQv (Standard #4) | Retain or treat the runoff from 85% of the storms that occur in an average year. For Georgia, this equates to providing water quality treatment for the runoff resulting from a rainfall depth of 1.2 inches. The water quality treatment goal is to reduce average annual post-development total suspended solids loadings by 80%. | |
| Channel Protection | Provide extended detention of the 1-year, 24-hour storm event released over a period of 24 hours to reduce bankfull flows and protect downstream channels from erosive velocities and unstable conditions. | |
| Overbank Flood Protection | Provide peak discharge control of the 25-year, 24-hour storm event such that the post-development peak rate does not exceed the predevelopment rate to reduce overbank flooding. | |
| Extreme Flood Protection | Evaluate the effects of the 100-year, 24-hour storm on the stormwater management system, adjacent property, and downstream facilities and property. Manage the impacts of the extreme storm event through detention controls and/or floodplain management. | |
| Notes: Source: Georgia Stormwater Management Manual, Volume II, Table 2.2.3-1. |
Stormwater Runoff Computation
Computations for rate of runoff shall be based on the rainfall intensities for any location across Georgia. Information related to rainfall intensities can be obtained through the National Oceanic and Atmospheric Administration (NOAA) Atlas 14 publication, or online using the Precipitation Frequency Data Server database (http://hdsc.nws.noaa.gov/hdsc/pfds). NOAA precipitation data should be used for all hydrologic analysis at the given locations. Additional information regarding how the values in this database were derived can be accessed using the link above.
Computing runoff and generating hydrographs must be done by one of the methods outlined in the GSMM, Volume II, Section 5. The table below summarizes the hydrologic calculation methods that will be accepted by the Department of Water Resources and the section reference from the GSMM that explains each. The table also provides guidelines for using the appropriate method based on the size of the drainage area. Additional information relating to the design of conveyance structures can be found in the GSMM. As noted, the rational formula can only be used to design conveyance systems, one of the other methods listed must be used for designing the stormwater detention facilities.
| Computation Task | GSMM Chapter | Rational Formula | SCS | USGS Equations | Water Quality Volume |
|---|---|---|---|---|---|
| Size Limitations for Each Method | 25 acres | 25 to 2,000 acres | 2,000 acres to 25 square miles | Based on BMP | |
| Water Quality Volume (WQv) | 2.2 | X | |||
| Channel Protection Volume (CPv) | 2.2 | X | |||
| Overbank Flood Protection (QP25) | 2.2 | X | X | ||
| Extreme Flood Protection (Qf) | 2.2 | X | X |
Storage Facilities 3.3 X X Outlet Structures 3.4 X X Gutter Flow and Inlets 5.2 X Storm Drain Pipes 5.2 X X X Culverts 5.3 X X X Small Ditches 5.4 X X X Open Channels 5.4 X X Energy Dissipation 5.5 X X Source: Georgia Stormwater Management Manual, Volume II, Table 3.1.1-1.
Water Quality Performance Criteria
Total suspended solids (TSS) are a key pollutant associated with sediment runoff. It also serves as a "carrier" of other pollutants such as organics, nutrients, and metals. Thus, TSS, a measure of suspended matter-including soils and sediments, will serve as the watershed improvement guideline for managing pollutants.
Storm Drain Pipe Design
Piped drainage structures shall be designed to meet the following criteria:
Pipe References and Requirements
Pipe references and requirements are as follows:
Pipe Installation Specifications
Pipe installation specifications are as follows:
Headwalls
Open Channels
General Stormwater Design Criteria
Nuisance conditions shall include: improper storage resulting in uncontrolled runoff and overflow; stagnant water with algae growth, insect breeding, and odors;
discarded debris; and safety hazards created by the facility's operation. Private facilities are the perpetual responsibility of the landowner.
Timing of Installation
Construction of the stormwater system shall be initiated as part of the grading of the site. Storm water detention facilities shall be constructed prior to the installation of any other site improvements, and may be utilized under proper design as sedimentation basins during development. Installation of all other storm drainage pipes, culverts, headwalls, and ditches, shall be coordinated with the construction of streets and other site improvements, as appropriate.